Open LMS WORK 4.5 MP8 Release Notes

IMG_7882.png

The Open LMS Product team is pleased to announce the release of WORK 4.5 MP8:

Release Schedule

SaaS Sandbox upgrades Apr 28, 2026
SaaS Production upgrades May 12, 2026
MH Production upgrades can begin May 13, 2026

Core version 4.5.11

As part of this minor release, the team in Open LMS upgraded the platforms and reviewed the code of version 4.5.11, adding the corresponding fixes, improvements, security patches, and important backports.

Release Notes

For the full releases notes from Moodle.org, please see:

4.5.11 Release Notes

Open LMS Highlights

Enhanced eCommerce Product Details Page for Programs

The eCommerce Product Details page has been enhanced to provide richer and more informative content for Programs and associated benefits.

With this update, additional Program metadata and benefit details are now included, offering users better visibility into what they are purchasing or enrolling in.

Program information now displayed (when available):

  • Program Name

  • Program Image

  • Category

  • Description

  • Courses included in the Program.

For other benefit types (such as single activities or certifications):

  • Name

  • Description

This improvement helps users better understand the full value of Programs and related benefits directly from the Product Details page.

download.gif

This feature can be enabled in:

/admin/settings.php?section=commercesettings

New Settings

  • showproductdetailpage

Upgraded plugins

Component Name Version
auth_oidc OpenID Connect Authentication 2024100730
block_microsoft Microsoft 365 Block 2024100720
filter_multilang2 Multilang2 Filter 2025041701
repository_office365 Microsoft 365 Repository 2024100730
theme_boost_o365teams Boost Microsoft Teams Theme 2024100730
local_o365 Microsoft 365 Integration 2024100730
local_office365 Office 365 Local Plugin 2024100730
local_onenote OneNote Integration 2024100730
local_pld PLD Local Plugin 2026032600
local_profilecohort Profile Cohort Sync 2024100702
local_redislock Redis Lock Backend 2026032600
assignsubmission_onenote OneNote Assignment Submission 2024100715
assignfeedback_onenote OneNote Assignment Feedback 2024100710
local_liquidus Liquidus Integration 2026032600
local_intelliboard IntelliBoard Integration 2026032302
qtype_ddmatch Drag and Drop Matching Question Type 2025051900
local_intellidata Intelliboard Pro 2026021801

 

Additional fixes and Improvements

Fix version

Description

Work 4.5 MP8
  • Merge 4.5.11  into Work 4.5 PM8
  • Bring changes from EDU to solve performance issue with unnecessary string loading ajax calls
  • ORE quiz attempt source includes previews in results
  • mod_pld: Verify sort parameter in get_rules_list call
  • Sorting Isues on tables on Different places
  • Expand Program Details in the eCommerce Product Page
  • ORE's Time to complete (since enrol date) values are not accurate
  • Mod PLD - Rules that trigger an user enrolment event with configured duration, trigger an error and disappear previously existing rules
  • Mod PLD -  Attached images from the "Send email" action, are not rendering into the received email
  • Course's PLD alert is displayed on the home page and dashboard
  • Fix issue with tenant name linked in tenant member report source
  • Risk Assessment Add "Number of Overdue Assignments" Column to ORE Course Completion Source
  • Notification to Related User when a learner starts a program
  • Get preparations for Work site on 5.1
  • Missing Help Text Clarifying AND Logic in Dynamic Cohort Rules
  • Ecommerce: The product detail page (PDP) information does not display correctly when the block drawer is open.
  • Adding a rule to dynamic cohort for program completion for program of ID 1 throws an error
  • Unexpected system warnings during user upload when a Taxonomy custom field is configured with allow multiple
  • ORE - Schedule report not sent unless schedule owned by main site administrator
  • Dynamic cohorts: "Sync When User Update" doesn't  remove users
  • Sessions: The completion doesn't reset, after changing the attendance of a session

 

Removal of Atto Editor (Effective July 2026)

As part of the upgrade to Moodle 5.1, scheduled for July 2026, the Atto editor will be fully removed, as previously announced in earlier versions.

The Tiny editor has been set as the default editor for some time, and we have continued to enhance it by adding sub-plugins and capabilities to provide the best possible content creation and editing experience across the platform.

We recognize that some clients may still be using Atto, or allowing end users to choose between Atto and Tiny. For this reason, we strongly recommend planning ahead for this change by promoting and encouraging the use of the Tiny editor prior to the Moodle 5.1 upgrade.

Taking these steps in advance will help ensure a smooth transition and adoption for users who may not yet be fully familiar with the Tiny editor.

 

Open LMS 5.1 Upgrade

As we prepare for the upcoming Major Upgrade, we invite you to explore what’s new in Moodle 5.0 and 5.1, the versions we will be upgrading to, along with key highlights from the Open LMS platform.

Release Schedule

  • Sandbox Upgrade: June 23, 2026

  • Production Upgrade: July 21, 2026

Was this article helpful?
1 out of 1 found this helpful